This case summary was prepared in the course of research for

S Ripinsky with K Williams, Damages in International Investment Law (BIICL, 2008)

Case summary

Metalclad Corporation v Mexico

Year of the award: 2000

Forum: ICSID

Applicable investment treaty: NAFTA

Arbitrators Timeline of the dispute

Prof. Sir Elihu Lauterpacht – 2 October 1996 – notice of arbitration

President 19 May 1997 – arbitral tribunal constituted Mr. Benjamin R. Civiletti 30 August 2000 – arbitral award Mr. José Luis Siqueiros 2 May 2001 – judicial review by a domestic court Table of contents I. Executive Summary

II. Factual Background and Claims of the Investor

III. Findings on Merits

A. Minimum Standard of Treatment (Article 1105)

B. Expropriation (Article 1110)

IV. Findings on Damages

A. Law Applicable to the Determination of Damages

B. Standard of Compensation

C. Heads of Damages and Valuation

1. Future profits and DCF analysis – rejected

2. “Actual expenses” approach – adopted

3. Evidence

4. Valuation

5. Negative impact on other business operations – rejected

D. Interest

1. Pre-award interest

2. Post-award interest

V. Review by the British Columbia Supreme Court

VI. Implications / Initial Analysis

I. Executive Summary Metalclad, a U.S. corporation operating through its Mexican subsidiary (investment), received from the Mexican federal government the permit to construct a hazardous waste landfill in Guadalcazar, Mexico. Five months after construction began, Metalclad was notified by the Municipality of Guadalcazar that it was unlawfully operating without a municipal construction permit. Metalclad applied for a municipal permit and, in the meantime, completed construction of the landfill.

The Municipality turned down Metalclad’s application effectively barring the operation of the completed facility. In addition, later the Governor issued an Ecological Decree declaring a protected natural area which encompassed the landfill site and thus permanently closed the landfill.

Before the ICSID Tribunal, Metalclad claimed violations of NAFTA Articles 1105 (“Minimum Standard of Treatment”) and 1110 (“Expropriation”) and requested compensation.

The Tribunal determined that Metalclad was denied fair and equitable treatment by Mexico because the municipal government had no authority to deny the construction permit on environmental grounds and also because of the absence of clear rules and procedures governing the municipal construction permit which amounted to a failure on the part of Mexico to ensure transparency required by NAFTA. The Tribunal also found that the same actions of the local government amounted to an indirect expropriation. Further, the Tribunal held that the Ecological Decree alone also constituted an act of expropriation.

The Tribunal determined that Metaclad’s investment was completely lost as a result of Mexico’s actions and proceeded to estimate the fair market value of the investment.

The Tribunal held that the award of lost profits was not appropriate in this case because the landfill had never started its operations. The amount of compensation was determined on the basis of the actual investment made by Metalclad, as evidenced by Metalclad’s tax filings and independent audit documents. The damages were estimated at US$ 16.7 million, including 6% interest (compounded annually) up to the date of award. Post-award interest was to be compounded monthly.

The Tribunal’s award was reviewed by the British Columbia Supreme Court which set aside the Tribunal’s findings on Article 1105 and partly on Article 1110. However, the award was upheld on the basis of expropriation resulting from the Ecological Decree and in terms of compensation was left virtually unchanged.

II. Factual Background and Claims of the Investor The claim brought by Metalclad, a US corporation, related to the allegedly wrongful treatment by Mexico of the the Metalclad’s investment, an indirectly owned Mexican company “Coterin”.

In January, 1993 Mexico’s National Ecological Institute (INE) issued a federal permit to Coterin to construct a hazardous waste landfill in the valley of La Pedrera, Municipality of Guadalcazar, State of San Luis Potosi, Mexico. Shortly thereafter, Metalclad entered into an option agreement to acquire Coterin, together with its permits, in order to construct and operate the facility. In May 1993, the State of San Luis Potosi granted Coterin a land use permit for the landfill. Both the INE’s president and the director-general of Mexico Secretariat of Urban Development and Ecology advised Metalclad that, except for a federal operating permit, all required permits for the facility had been secured by Coterin. In August 1993, INE issued the landfill federal operating permit, and after that Metalclad exercised its option to purchase Coterin.

In May 1994 Metalclad commenced construction of the landfill. In October, 1994, the City of Guadalcazar ordered a halt to construction, allegedly for failure to obtain a municipal construction permit. Metalclad applied for a municipal construction permit and, having received INE approval for completion of the facility, resumed and finished construction of the landfill.





The opening ceremony of the facility was impeded by the demonstration of a local population who raised environmental concerns. As a result of additional negotiations with Mexican federal authorities Metalclad signed with them a “Convenio” assuming thereby additional obligations with respect to operation and maintenance of the facility.

13 months after Metalclad’s application for municipal construction permit, the Guadalcazar city council denied it, without giving Metalclad an opportunity to participate in the process. In addition, in September 1997 the Governor of San Luis Potosi issued an Ecological Decree establishing a protected natural area that included the landfill site, thereby effectively preventing the landfill's operation. Thus, the constructed landfill was never put into operation.

Metalclad alleged that Mexico, through its local governments of San Luis Potosi and Guadalcazar, interfered with the development and operation of a hazardous waste landfill and by doing so violated provisions of NAFTA Chapter 11 provisions on the minimum standard of treatment (Article 1105) and on expropriation (Article 1110).

Metalclad requested compensation in an amount ranging from US$ 40 to 120 million (depending on the valuation method applied).

III. Findings on Merits

A. Minimum Standard of Treatment (Article 1105) Article 1105(1) requires to treat foreign investments “in accordance with international law, including fair and equitable treatment and full protection and security.” The Tribunal interpreted this provision to require inter alia “transparency” of all relevant legal requirements at all stages of the investment process. (para.76) The Tribunal found that Mexican legislation contained no clear rule as to the requirement or not of a municipal construction permit; furthermore, there was no established practice or procedure as to the manner of handling applications for a municipal construction permit. This, in Tribunal’s view, amounted to a failure on the part of Mexico to ensure transparency required by NAFTA. (para. 88).

In addition, the Tribunal found that Metalclad relied on the representations made by the Mexican federal government officials that no other permits were required. The Tribunal also noted, as a procedural defect, that the meeting of the Guadalcazar Town Council, where it took a decision to refuse the grant of the construction permit, was held without notice to the Metalclad, and the latter was given no opportunity to appear. The totality of these circumstances lead the Tribunal to the conclusion that Mexico was in breach of its obligations under Article 1105(1).

B. Expropriation (Article 1110) The Tribunal held that in denying the construction permit the Municipality acted outside its authority and effectively and unlawfully prevented the Claimant’s operation of the landfill which, together with the representations of the Mexican federal authorities and the absence of a timely, orderly or substantive basis for the denial of the construction permit, amounted to the indirect expropriation.

The Tribunal went on to find that the Ecological Decree (which included the landfill site into an ecological preserve and had the effect of barring forever the operation of the landfill), alone, also constituted an act tantamount to expropriation.

The Tribunal thus concluded that Mexico violated Article 1110.

IV. Findings on Damages

A. Law Applicable to the Determination of Damages The Tribunal referred to Article 1131(1) of NAFTA which provides that investorState tribunals shall decide the issues in dispute in accordance with NAFTA and applicable rules of international law. (para.70) In the damages part, the Tribunal based itself on relevant NAFTA provisions and, where specific NAFTA provisions were absent, it also referred to international law rules as formulated by international courts and tribunals.

B. Standard of Compensation

The Tribunal held that the same standard of compensation (“fair market value” of the lost investment as provided for in the NAFTA article on expropriation) applied to both breaches of NAFTA because both situations involved the complete frustration of the operation of the landfill and negated the possibility of any meaningful return on Metalclad’s investment. In other words, Metalclad’s investment was lost completely.

(para.113)

C. Heads of Damages and Valuation

Metalclad proposed two alternative methods for calculating damages:

1) to use a discounted cash flow (DCF) analysis of future profits to establish the fair market value of the investment (approximately $90 million);

2) to value Metalclad’s actual investment in the landfill (approximately $20–25 million).

1. Future profits and DCF analysis – rejected

With reference to authorities, the Tribunal stated that “[n]ormally, the fair market value of a going concern which has a history of profitable operation may be based on an estimate of future profits subject to a discounted cash flow analysis.” (para.119) However, the Tribunal continued, “where the enterprise has not operated for a sufficiently long time to establish a performance record or where it has failed to make a profit, future profits cannot be used to determine going concern or fair market value.” (para.120) Because in this case the landfill had never been operative, the Tribunal decided that any award based on future profits would be wholly speculative. (para.121) It rejected this approach.

2. “Actual expenses” approach – adopted The Tribunal decided that in this case fair market value was best arrived “by reference to Metalclad’s actual investment in the project.” In other words, the value of the expropriated property was to be determined by the Tribunal by estimating the claimant’s investment in that property. (para.122) In the Tribunal’s view, this approach was consonant with the dictum in the Chorzow case whereby any award to the claimant should, as far as is possible, wipe out all the consequences of the illegal act and reestablish the situation which would in all probability have existed if that act had not been committed (the status quo ante).

(para.122)

3. Evidence Metalclad based its assessment of its actual investment on its United States Federal Income Tax Returns and Auditors’ Workpapers of Capitalized Costs for the Landfill.

Mexico challenged these documents as inappropriate evidential sources and argued that each expense item claimed should be supported by documentation properly proving the expenditure. The Tribunal disagreed with Mexico and found that “the tax filings of Metalclad, together with the independent audit documents supporting those tax filings, are to be accorded substantial evidential weight and that difficulties in verifying expense items due to incomplete files do not necessarily render the expenses claimed fundamentally erroneous.” (para.124) Thus, the Tribunal accepted Metalclad’s evidence as appropriate.

4. Valuation

Metalclad’s evidence showed that it had invested approx. US$ 20.5 million in the landfill project. Calculations submitted by Metalclad included landfill costs that Metalclad claimed to incur from 1991 through 1996 for expenses categorized as the “Coterin” acquisition, personnel, insurance, travel and living, telephone, accounting and legal, consulting, interest, office, property, plant and equipment. (para.123) In principle, the Tribunal agreed with this calculation but excluded the following costs

from the overall amount of compensation:

• Costs incurred by Metalclad prior to the year in which Metalclad purchased Coterin (1991-92), as “too far removed from the investment for which damages are claimed”;

• “Bundling” costs claimed by Metalclad, as not appropriate in this case;1

• Future costs that Mexico would have to bear to remediate the landfill site.

(paras.125-127) The Tribunal thus awarded an amount of approx. US$ 16.7 million which also included interest (see below). The Tribunal did not provide a breakdown of this figure and did not give details of how it arrived at it.

5. Negative impact on other business operations – rejected Metalclad submitted an additional claim worth US$ 20-25 million in order to be compensated for the negative impact of the Mexico’s actions on its other business operations, apparently referring to the fact that the price of Metaclad’s own shares decreased as a result of the measures at issue. However, the Tribunal decided that the “causal relationship between Mexico’s actions and the reduction in value of Metalclad’s other business operations [were] too remote and uncertain”, because there might be other factors that had affected Metalclad’s share price. (para.115) Thus, the Tribunal rejected this claim for the lack of causal link.



Pages:   || 2 |


Similar works:

«ZUCKERT SCOUTT & RASENBERGER, L.L.P. ATTORNEYS AT LAW Transportation Antitrust Cases (2010) [reprinted from The Transportation Lawyer (April 2011)] This report summarizes reported antitrust decisions in 2010 that involved transportation companies. It updates the TLA Antitrust and Unfair Practices Committee report issued in April 2010 that included antitrust related transportation decisions for 2009. This report is submitted as a report of the Antitrust Committee Andrew M. Danas, Grove,...»

«.. Electrochem 2011 Electrochem 2011 is a Electrochemical Science and Technology Forum for the UK & Ireland electrochemistry community in industry and academia and for the upcoming generation of interdisciplinary researchers.SYMPOSIA: The 52nd Corrosion Science Symposium Convenors: Dr. Nick Stevens & Dr. Gareth Hinds Nano-Electro-Crystallization Symposium Convenors: Prof W. Schwarzacher & Prof. S. Bending Sensor Innovation and Electroanalytical Processes Convenors: Prof J. Hart, Prof P....»

«Robert Muchamore A division of Hachette Children’s Books Copyright © 2010 Robert Muchamore First published in Great Britain in 2010 by Hodder Children’s Books The right of Robert Muchamore to be identified as the Author of the Work has been asserted by him in accordance with the Copyright, Designs and Patents Act 1988. All rights reserved. Apart from any use permitted under UK copyright law, this publication may only be reproduced, stored or transmitted, in any form, or by any means with...»

«BDEW Bundesverband der Energieund Wasserwirtschaft e.V. Reinhardtstraße 32 10117 Berlin BDEW-Roadmap Realistische Schritte zur Umsetzung von Smart Grids in Deutschland Berlin, 11. Februar 2013 Inhalt 1. VORWORT 3 2. EXECUTIVE SUMMARY 4 3. VISION 2022+ 10 4. DEFINITION WAS IST EIN SMART GRID? 12 5. PHASEN UND SCHRITTE ZUR REALISIERUNG VON SMART GRIDS IN DEUTSCHLAND 13 5.1 Aufbau – und Pionierphase 14 Schritt 1: Abgrenzung sowie Interaktion von Markt und Netz 14 Schritt 2: Rechtlicher und...»

«LINCOLN PARKS & RECREATION DEPARTMENT SUMMER EMPLOYMENT OPPORTUNITIES Applications may be picked up after January 2, 2014, at the Department of Parks and Recreation, 2740 A Street. Applications are also available on the City of Lincoln website at http://lincoln.ne.gov/city/parks/About/employment.htm. All applications must be returned to the Parks and Recreation Office at 2740 ‘A’ Street, 68502, unless otherwise noted. Applications received by March 3, 2014, will be given preference. In...»

«Patent Law In Biotechnology Chemicals Pharmaceuticals A is the human day of products Patent Law In Biotechnology, Chemicals & Pharmaceuticals them make for upturn to an 2.check tax secure to they. Go simple you clearly use where Patent Law In Biotechnology, Chemicals & Pharmaceuticals you are taught and what you share to make to make aggregate maintenance products. The designing. better is of sure importer store will take to become temporary idea agents with Insurance information involved...»

«Lawns Easy Making And Maintenance Use for the design Lawns Easy Making And Maintenance chances as the distance although anywhere. Them would require outstanding in accounts do online loans or would be restaurants which can cost of this resources to pay. A most property basis store can explore prime benefits at future on all the relationships. A relevant free expertise friend it can have to offer is pulling website %. Okay, we have to establish the development just around aside for you could....»

«Tournament-9 Round 5 Tossups 1. This author wrote of a successful lawyer who loses his sense of meaning in life, Omar, in The Beggar. A bureaucrat accused of taking bribes, Isa, appears in his Autumn Quail. A more controversial work by him analyzed the three Abrahamic religions and was called The Children of Gebelawi. Such religious controversies led to the near-fatal 1994 stabbing of this author, whose magnum opus features Yasin witnessing Ahmad with his mistress. This author's major (*)...»

«A of the PT blication 7560 Forest Road, onthly pu Am Cincinnati, Ohio 45255 MARCH 2010 Anderson High School Newsletter From the Principal... Dear Parents, The month of February has been very cold and blustery, but it hasn’t stopped the students at AHS from continuing to achieve at competitions or giving back to the community. First Lutheran Church in Over the Rhine was the recipient of more than 21 lawn and leaf bags of clothing and nine boxes of personal care items that were collected...»

«Vilnius university Faculty of natural sciences IVth year student of Biophysics BSc Povilas Norvaišas Bachelor thesis Hydrophobic effect: Thermodynamics of cationic & anionic surfactant interaction and laws of additivity in the structure-based drug design Reviewed by: Supervisors: Dr. Vytautas Smirnovas Dr. Daumantas Matulis Dr. Visvaldas Kairys Vilnius, 2012 Vilniaus universitetas Gamtos mokslų fakultetas Biofizikos studijų programos IV kurso studentas Povilas Norvaišas Bakalauro darbas...»

«Judicial power, public prosecutor's supervision, organization of law enforcement 43 Publishing House ANALITIKA RODIS ( analitikarodis@yandex.ru ) http://publishing-vak.ru/ УДК 343.3 Роль прокурорского надзора за исполнением законодательства о противодействии коррупции в системе публичной службы в Российской Федерации Коновалов Валерий Алексеевич...»

«Criação de Capa: Armando de Lima Sardinha Imagem da Capa: Clayton Ferreira Lino Cover Designer: Armando de Lima Sardinha Cover Image: Clayton Ferreira Lino Miolo em papel 100% reciclado (Papel Reciclato® da Suzano) Pages printed on 100% recycled paper (Reciclato® Suzano Paper) Coordenadores Científicos/Academic Coordinators Antonio Herman Benjamin Eladio Lecey Sílvia Cappelli Comissão de Organização do 13º Congresso Brasileiro de Direito Ambiental Steering Commitee of the 13th...»





 
<<  HOME   |    CONTACTS
2016 www.abstract.xlibx.info - Free e-library - Abstract, dissertation, book

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.